19-30 June

Ground floor (Car Park) 每 Paving works & muck坼away

  • Lifting of additional paving slabs and removal of loose materials to uncover further sections of the slab.

Disturbance 每 Medium坼level disturbance due to the use of a hoist and compressor being located at ground level, hoisting up and down materials.

  • Saw / Disk cutting of the car park slab.

Disturbance 每 some medium level noise and disturbance from the use of large saw/disk cutting equipment into the concrete slab. Craning of sections.

  • Contractor deliveries to the site will be frequent, but measures are in place to control traffic flow 每 they are not expected to restrict the movements of delivery vans or visitors.

坼1 Basement (Lankester room) 每 Lift shaft works

  • Formation of concrete block lift pit wall.

Disturbance 每 Medium坼level disturbance due to the use of a hoist and compressor being located at ground level, hoisting up and down materials.

  • Contractors will access the area via the fire escape stairs on the Abbot*s Kitchen side of the library.

坼2 Basement (The Stack) 每 Formation of concrete pit and lift shaft works

  • Remove concrete sections of basement floor slab.

Disturbance 每 Medium坼level disturbance due to the use of a hoist and compressor being located at ground level, hoisting the large concrete section up. Noise from concrete sections being dropped into the lorry.

  • Some excavation of soil/clay and clay slurry from 坼2 level pit.

Disturbance 每 Medium坼level disturbance due to the use of a hoist and compressor being located at ground level, hoisting up and down materials.

  • Possible need to break out further concrete of existing building foundations, subject to findings.

Disturbance 每 Medium to high坼level disturbance due to the use of a hoist and compressor being located at ground level, hoisting up and down materials, and use of a jack hammer to break out further sections of concrete.

  • Installation of concrete shuttering and steel reinforcement to form concrete pit.

Disturbance 每 Medium坼level disturbance due to the use of a hoist and compressor being located at ground level, hoisting up and down materials.

  • Formation of concrete block lift pit wall.

Disturbance 每 Medium坼level disturbance due to the use of a hoist and compressor being located at ground level, hoisting up and down materials.

  • Contractors will access the area via the fire escape stairs on the Abbot*s Kitchen side of the library.
Back to top